05 / RESEARCH & SOURCE PROVENANCE
Ten references behind the measurement and cost system
A targeted review of original standards and open technical documentation. Each source shows its recommended application and what it does not authorize. Reviewed 31 October 2026.
Research references · not project approvalsMethod and boundaries
Selection criteria: primary issuing body, relevance to quantity takeoff, work pricing, billing or reproducible software, and an accessible public description. The list is ranked for this JP website—not a scored systematic literature review. For projects in Nepal, verify the applicable NBC, municipal requirements, contract and approved measurement rules before use.
- LR-01 · Royal Institution of Chartered Surveyors (RICS)
NRM 2 — Detailed measurement for building works
October 2021; reissued as practice information October 2022
Apply: Trade-specific measurement conventions, quantity rules, description and unit discipline
Boundary: Not a Nepal statutory standard; project contract measurement rules and local codes prevail.
Read original publication ↗ - LR-02 · Royal Institution of Chartered Surveyors (RICS)
NRM 1 — Order of cost estimating and cost planning
October 2021; reissued October 2022
Apply: Separate early cost plans, element/group summaries, allowances, exclusions and AOC-like presentation
Boundary: NRM grouping does not prescribe this project's approved tax or contingency amounts.
Read original publication ↗ - LR-03 · AACE International
Guide to Cost Estimate Classification Systems
Professional Guidance Document No. 01; revision August 29, 2022
Apply: Classify maturity of a price/estimate rather than presenting tentative assumptions as tender-ready
Boundary: The exact AACE estimate class requires definition-maturity evidence, not arbitrary labels.
Read original publication ↗ - LR-04 · buildingSMART International
Industry Foundation Classes (IFC), version 4.3
IFC 4.3.2.0; ISO 16739-1:2024
Apply: Vendor-neutral model identifiers, geometry lineage and model-backed quantity evidence
Boundary: IFC quantities require independent quantity/method validation before financial admission.
Read original publication ↗ - LR-05 · IfcOpenShell open-source documentation
IfcOpenShell cost and quantity schedule API
API documentation; accessed 2026-10-31
Apply: Interoperable BIM cost items, quantities, cost schedules and formulas; coordinate with JP CAD
Boundary: Implementation reference, not itself an approved construction rate or design certification.
Read original publication ↗ - LR-06 · Quarto / Posit open-source project
Quarto — reproducible scientific and technical publishing
Current online documentation; accessed 2026-10-31
Apply: Preferred flexible .qmd format for irregular calculations, formulas, methods, illustrations and HTML/PDF outputs
Boundary: Executable cells must be run only inside controlled workflows; never treat private notebooks as public site inputs.
Read original publication ↗ - LR-07 · Project Jupyter
The Jupyter Notebook Format (nbformat)
nbformat 5.11 documentation; accessed 2026-10-31
Apply: Alternative .ipynb format when exploratory calculations need narrative plus code and rich outputs
Boundary: Notebook execution is not proof of source validity; clear sensitive outputs before publication.
Read original publication ↗ - LR-08 · World Wide Web Consortium (W3C)
PROV-O: The PROV Ontology
W3C Recommendation, April 30, 2013
Apply: Record source → calculation → validation → reviewer → publication provenance links
Boundary: Use a small compatible provenance model; avoid adding unnecessary semantic-web infrastructure.
Read original publication ↗ - LR-09 · Open Contracting Partnership
Open Contracting Data Standard (OCDS)
OCDS 1.1.5 documentation (reviewed 2026-10-31)
Apply: Distinguish procurement, supplier/contractor award, contract changes, implementation and actual payments
Boundary: Public-sector publication schema as a reference; does not authorize exposing private commercial transactions.
Read original publication ↗ - LR-10 · GitHub Documentation
Configuring GitHub Pages publishing with Actions
Current online documentation; accessed 2026-10-31
Apply: One validated static publication workflow and explicit visibility boundaries
Boundary: Pages is static/public; not a secure edit interface or private source-data store.
Read original publication ↗
Audit trail and references
Machine-readable bibliography: source register JSON. The original publications remain with their issuing organizations. This website does not mirror or claim ownership of their copyrighted documents.
Review ID JP-LIT-20261031 · source-use status CURATED_NON_CERTIFYING · prospective cost calculations require separate project evidence and engineer/contract approvals.