03 / QUANTITY TAKEOFF

Measurements → BOQ → Abstract of Cost

All projects inherit one governed three-stage template. Each project has individual trade measurement pages, a compact source-derived Bill of Quantities, and an Abstract of Cost summarizing only approved BOQ groups.

From rough notes to verified quantities

Open the flexible calculation workspace →

Measurement rules

Work item ID · drawing/model/FID · revision · verified quantity · measurement method · unit · approval provenance.

Source evidence required

BOQ calculation

Measured quantity × selected compatible unit rate = work amount. No placeholder zero quantities.

Amrit Rawat detailed measurements → · Derived BOQ →

Cost Abstract (AOC)

Groups verified BOQ lines, explicitly approved allowances, exclusions, and contingency. No totals before eligible BOQ exists.

Amrit Rawat AOC readiness →

Reusable BOQ schema

The original boq-template.json remains blocked pending verified CAD/FID import. The new common costing template documents work measurements, BOQ, AOC and commercial bill extensions.

Editable master Google Sheet → · Machine contract → · Historical blocked schema →

Running bills, invoices and actual payments

Contractor RA bills track certified work done; vendor invoices track goods or services delivered; original Finance Sheets own settled payments. These are separate records and cannot be treated as a single BOQ total.

Amrit Rawat billing register →

Measurement & pricing literature

RICS NRM 2 guides detailed measurement; NRM 1 distinguishes cost planning; IFC and IfcOpenShell support model-to-quantity lineage; W3C PROV-O informs source tracking. These are methodological references, not local statutory approvals.

See ten cited primary references and applicability →

CAD column-axis and measurement handoff

Source-marked grid positions are available for Narayani and Harisharan, but an axis reference alone is not a measured or approved structural member. Each future CAD measurement row must carry its exact source member ID, floor, source fingerprint and approved source-to-model registration. Draft BOQ values remain blocked until those checks pass; Amrit's measurement register remains empty.

Machine-readable CAD handoff and HOLD states · CAD Drawing Control Tower · CAD Memory Palace

CAD boundary

JP Computer-Aided Drawings repository owns geometry and measurement source evidence. The estimation tool can accept a separately validated export in a future version.