RE-AMRIT-RAWAT-W14 / MEASUREMENT BOOK / WORK-SCREEDING
Floor screeding · Detailed Measurements
A separate work-type measurement page for each project, following the same master QTO schema. Every row must retain original dimensions/measurement method, location and drawing or attachment reference.
Source-backed · no invented quantities or claimsMethod notes: Loading…
Each verified row needs quantities, deductions if applicable, revision, source evidence and approval. Alternative site-contract units must be explicitly mapped, never silently converted.
Source verification and calculated view
PENDING SOURCE VALIDATION
No measured or certified project quantities have been admitted. The Discord category label is a method index only; no Fishtail material has been transferred into Amrit.
| Measurement ID | Location / Grid | Measured Qty | Unit | Drawing Revision | Source Evidence ID | Verification |
|---|---|---|---|---|---|---|
| Source status loading… | ||||||
Authority and workflow
No measured or certified project quantities have been admitted. The Discord category label is a method index only; no Fishtail material has been transferred into Amrit. Human-editable project registers remain in their single LIVE Google Sheet when admitted; verified CAD/FID exports own geometric measurements. GitHub Pages is a read-only projection, not an editable accounting ledger.
Standard template and methods →