JP · RATE INTELLIGENCE · NEPAL
Every rate has a story.
Open-sky clarity for Nepal construction rates: published district prices, independent user references and transparent, resource-by-resource analysis. No invented building measurements.
JP COST & RATE INTELLIGENCE · RESEARCH v0.5.1-alpha
Rate Library
Choose a cost-estimation workspace
RATE SOURCES AND WORKSPACES
Four independent rate libraries. One connected system.
Source Rates & Benchmarks
Search separately attributed rates by specification, source, location and unit. Government benchmarks are not vendor quotations or approved job prices.
Transparent Rate Analysis
Work out the cost of one finished unit of work from explicit resource consumption and price evidence.
Resource quantities must be the amounts required for one finished output unit; their price basis must match their consumption unit.
| Resource / item | Type | Qty per unit | Resource unit | Waste % | Price per resource unit (NPR) | Source ID / evidence reference | Derived amount |
|---|
line_cost = resource_qty_per_output_unit × (1 + waste_pct / 100) × unit_price
draft_direct_rate = sum(line_costs) for 1 output unit
No automatic markup, escalation, tax, labour productivity or transport allowance is applied. Add a separately priced, sourced resource line when such a cost belongs in the recipe. Output is an unapproved draft until its quantities, specifications and evidence are verified.
Sources & Provenance
Where data comes from, which authority class it belongs to and what has not been verified.
Canonical authority
The AEC Cost/Rate Master on Google Drive owns normalized source observations. The Neon CR-02 subset is a read-only mirror; user-known rates are separate. Project expenses are not silently converted into rate-book observations.
The current public GitHub Pages host may not expose the Vercel /api/cr02-rates endpoint. Unavailable live data must be shown as unavailable, never substituted by demo rates.